Water Resources
As a utility construction arm, MIESCOR's contribution in waterworks includes construction and rehabilitation of major pumping stations, expansion and upgrading of water distribution networks and pipe laying of water distribution mains of Maynilad Water Services Inc.; detailed engineering for the Malitubog-Maridagao Irrigation System; construction for the Angat Water Supply Optimisation, Vigan Water Supply System, Tanong Watermains Extension, and the Ilocos Norte Water District Projects; construction and maintenance of Meralco Ortigas Compound Sewage Treatment plants.

Malitubog - Maridagao Irrigation Project
MIESCOR provided detailed engineering, consulting and project management of the Irrigation project intended to cover a total land area of 19,601 hectares.
South Manila Area Project
MIESCOR undertook for Maynilad Water Services the pipelaying of watermain in various sizes; 60.5km Primary:300 to 1200mm diameter (1.09km); Secondary: 150 to 250mm diameter (44.78km) Tertiary: 75 to 100mm diameter (14.26km).
Angat Water Supply Optimization Project
MIESCOR handled the supply and installation of water distribution system in the stretch of San Juan, Mandaluyong, Quezon City, and Marikina for Metropolitan Water Sewerage System and Manila Water Company, Inc.


Vigan Water Supply System Project - Phase I, II, and III
Outside Metro Manila, MIESCOR undertook the Vigan Water Supply Project. MIESCOR has been engaged by Fundacion Canovas del Castillo (FCC), a Spanish non-government organization (NGO), for the development and full implementation of the Drinking Water Supply to peripheral barangays of the Municipality of Vigan. FCC is sponsoring the project with a Philippine counterpart - Philippine Business for Social Progress.
Tañong Watermain Extension Project - Package IV
MIESCOR participated in the construction of 1200m diameter Tañong Watermain Extension crossing Marikina River for Metropolitan Water Sewerage and Manila Water Company, Inc.
Ilocos Norte Phase I Project
MIESCOR completed the construction of the 13,590m concrete reservoir and installation of 23,220m pipelines and standby generators in Laoag City for Local Water Utilities Administration and Ilocos Norte Water District.