MIESCOR undertakes engineering, procurement, construction, testing and commissioning, operation and maintenance of electric power transmission lines and substations - ranging from low voltage (34kV) to extra-high voltage (500kV).

Transmission Line and Switchyard for AWOC
The proposed two-phased wind power project of AWOC in Rizal province has secured regulatory approval for the construction of dedicated point-to-point transmission facilities that will connect it to the load network of Manila Electric Company.
The initial phase of the transmission facility connection will cover the 67.5-MW Pililla wind power plant.
The wind farm’s direct connection to Meralco’s distribution network through the 115-kV Malaya-Teresa transmission line has been elected as the “best option,” primarily in consideration of accessibility and reliability factors as the distance is considerably shorter and the costs are relatively lower than other configurations.
AWOC emphasized that “the Pililla wind farm intends to source its own power requirement of 600 kW (kilowatts) from Meralco.” The facility will be equipped with 27 wind turbine generators with a capacity of 2.5 MW each.

GNP-Kauswagan to Balo-I/Abaga 230kV Transmission Line

GNP-Kauswagan 69kV Transmission Line

DLPC Construction of 69kV Line

138kV Transmission Line from Kirahon SS to PSC/ECAC

Installation of Support Rod and Relocation of Guy Wire

Malita - Matanao 230kV Transmission Line Project
Schedule 1 and Schedule 2
Erection and Construction of Malita - Matanao 230kV Transmission Line Project
Eagle Cement 69kV Transmission Line
Supply of design & engineering, materials, labor & supervision, tools, equipment, consumable materials and project management for the erection and installation of 69kV Transmission line for Line 2 project

Opol Substation Project (Transmission Line Portion)
14 km 138 kV Opol Transmission Lines
Supply, delivery, installation, erection, civil works, stringing works, testing and commissioning. Modification of Ground Wire Peaks to conform with zero shielding angle. Includes 54km Live line reconductoring works.
CEDC INGASCO-69kV Transmission Line

CEDC Installation of 13.8kV Underground Line

Hedcor Manolo Fortich 138kV Switchyard Project and 138kV Transmission Line Project